arrow--leftCreated with Sketch. arrow--rightCreated with Sketch. bg-archCreated with Sketch. bg-archCreated with Sketch. closeCreated with Sketch. facebookCreated with Sketch. googleplusCreated with Sketch. icon-emailCreated with Sketch. icon-phoneCreated with Sketch. icon-play icon-zoom linkedinCreated with Sketch. logo-iconCreated with Sketch. logo-text 2Created with Sketch. menuCreated with Sketch. twitterCreated with Sketch. youtubeCreated with Sketch.

Boulder 75th Street Wastewater

Boulder, Colorado

Eidos Architects recently completed work with Tetra Tech Engineering to complete the architectural work on a new Biosolids Dewatering Building and a new Centrate Pump Building which are part of the Boulder 75th Street Wastewater Treatment Plant.  The new buildings are designed to compliment the existing buildings at the Boulder Wastewater Treatment Plant complex as well as respect the surrounding rural areas.