Fruita Wastewater Reclamation Facility
Fruita, Colorado
3D Renderings
Eidos Architects recently completed the new Fruita Wastewater Reclamation Facility with Tetra Tech Engineers. The design for the new facility includes:
- Operations/Maintenance Building
- Headworks Building
- Solids/UV Building
The Operations Building is 3,000 sf in size and includes offices, training and break room, a laboratory and locker/shower rooms, as well as a maintenance bay. The building incorporates many sustainable features including geothermal heat exchange, high insulation values for walls and roof as well as recycled and renewable finish materials.