arrow--leftCreated with Sketch. arrow--rightCreated with Sketch. bg-archCreated with Sketch. bg-archCreated with Sketch. closeCreated with Sketch. facebookCreated with Sketch. googleplusCreated with Sketch. icon-emailCreated with Sketch. icon-phoneCreated with Sketch. icon-play icon-zoom linkedinCreated with Sketch. logo-iconCreated with Sketch. logo-text 2Created with Sketch. menuCreated with Sketch. twitterCreated with Sketch. youtubeCreated with Sketch.

Fruita Wastewater Reclamation Facility

Fruita, Colorado

Eidos Architects recently completed the new Fruita Wastewater Reclamation Facility with Tetra Tech Engineers.  The design for the new facility includes:

  • Operations/Maintenance Building
  • Headworks Building
  • Solids/UV Building

The Operations Building is 3,000 sf in size and includes offices, training and break room, a laboratory and locker/shower rooms, as well as a maintenance bay. The building incorporates many sustainable features including geothermal heat exchange, high insulation values for walls and roof as well as recycled and renewable finish materials.